 |

A foyer in front of the international conference hall on the first floor.
 |
 |  |
| Building work: |
|
| Ground-breaking: |
February 1997 |
| Structural work: |
June 1997 – October 1999 |
| Interior work: |
June 1999 – April 2001 |
| Completion: |
April 2001 |
| Handed over: |
2 May 2001 |
Technical details: |
|
| The Chancellor's Office has 370 rooms and can host a staff of about 450 |
| Total area of the property: |
73,000 m² |
| Area without the park: |
44,000 m² |
| Built area (including atria): |
12,000 m² |
| Usable floor space: |
19,000 m² |
| Outdoor facilities: |
|
| Ceremonial courtyard: |
4,700 m² |
| Chancellery garden: |
6,400 m² |
| Chancellery park: |
30,000 m² |
| Other figures: |
|
| Height of the main building: |
36 m |
| Length of the north wing: |
182/204 m |
| Length of the south wing: |
300/335 m |
| Height of the side wings: |
18 m |
| Number of floors in the side wings: |
5 |
| Basement floors: |
2 |
| Number of glass atria: |
13 |
| The retaining wall: |
|
| Length: |
ca. 600 m |
| Height: |
4,10 m |
|
 |